I'd like to see extending the "map hidden month" tool to let it work with subsequent iterations of Jasmer like map DT does with the fizzy grid.

Maybe with a possibility of filtering by years so one can see what he/she needs to finish their "second Jasmer loop" but also "n-th Jasmer loop of 2005".

I can imagine other nice features for this tool but I don't want overload the topic now.
in Feature requests by Murazor (350 points)

1 Answer

+3 votes
It already works that way. Just add the Loop filter.
by pinkunicorn (Moderator) (197k points)
Note, that this feature is for paying members only.
When adding the loop qualifyer my previous finds are also shown. It would be nice if only caches that can be used to close loops are shown.
You can go to the G-icon in the top left of the map and deselect the display of caches you have already found.
...