More than once a week week I get an email 'Project-GC Edited logs notifier' with notifications of very old logs. Today there would be 18 "edited logs", The original logs were all from 2017, 2018 and one 2019.
I still have the original logs and I cannot find any difference between the original log and the edited log.
Is there an over-active script, generating these notifiers?